Home Bulletin Readings Staff
3 Yr OLD & PRE K
BULLETIN ADVERTISERS
CHURCH LOCATION
CONSTRUCTION ARCHITECTURE FIRM
ELEMENTARY FORMATION
Envision Committee
faith formation documents and web sites
HIGH SCHOOL FORMATION
HISPANIC MINISTRY AND ESL
mIDDLE SCHOOL FORMATION
MINISTRIES, PROGRAMS, AND ACTIVITIES
MINISTRY SCHEDULE
MUSIC MINISTRY
MY HOUSE VIDEO
OUR CONTRUCTION PROJECT
Pastoral Council
RELIGIOUS LINKS

Saint Francis of Assisi
2746 Fifth Street
Castle Rock, Colorado 80104

Phone: 303-688-3025
Fax: 303-688-4016

Office Hours:
Monday - Friday
8:30 am - 4:30 pm


Mass Times

Saturday:
5:30 pm

Sunday:
7:30 am, 9:30 am, 11:30 am

Spanish:
7:00 pm (2nd and 4th Saturdays of the month)

Daily:
9:00 am (Tuesday, thru Friday)

Holy Days:
As Announced

Care Center:
Castle Care Nursing Home on the first Friday of the month and at Brookside Inn Care Center on the second Friday of the month. Both times are at 11:00 am and Parishioners are welcome to join the residents for Mass.

Confession/Reconciliation:
4:45 pm - 5:15 pm
(Saturdays or by appointment)

Eucharistic Adoration:
Mondays 9:30 am - 1:00 pm


OUR CONSTRUCTION PROJECT

Phase I

The first phase of the St. Francis of Assisi Roman Catholic Church project involves earthwork, sitework, roadway widening and parking lot construction. Phase I will be complete in Spring 2009. Specific tasks include:

Overlot grading , or smoothing the terrain for roadway, parking lot, curbs and gutters.

  • Rock mitigation , or removing rocks that may become unstable, on the south cliff face that overlooks the Town of Castle Rock. After rock mitigation, the team installed erosion control systems to stabilize the landscape and encourage native plant revegetation.
  • Relocating power lines to accommodate the new parking lot layout.
  • Widening 5 th Street with new deceleration and acceleration lanes, which will increase visibility and entrance safety.
  • Building a new parking lot with 275 spaces.

Phase II & Phase III (text provided by Brett)

Phase 2:

Exterior Gathering Space:

  • Accent lighting
  • Landscaping
  • Sitting/gathering areas

Interior Gathering Space:

  • Overflow seating of approx. 175 seats with a direct view of the Altar.
  • An information center with wet bar functions for social events.
  • Direct connection to the existing facility and the Nave.
  • A direct view of Pike’s Peak.
  • Access to an exterior garden/gathering space located on the south side of the Gathering Space.
  • Sitting areas

Nave:

  • Seating capacity of 826 – roughly double of the existing Nave.
  • An expanded Choir area.
  • Handicap accessible platform for the Altar and Ambo.
  • New Baptismal Font for both sprinkling and emersion.
  • Reuse of the existing stations of the cross.
  • Carpenter Gothic architecture in the entrance and major windows.
  • A cupola located over the Altar introducing natural light into the center of the Nave.

Ancillary Spaces:

  • Restroom
  • Art and Environment room
  • Choir practice room
  • Choir practice storage
  • General storage
  • Vesting and Working Sacristies
  • Bride/Bereavement room
  • Ushers room
  • Renovating the existing Nave into a Parish Hall

Phase 2a:

  • Administrative offices which include:

o    Pastor’s office

o    Business Administrator’s office

o    Five Ministry offices

o    Break Room

o    Open office area

o    Two Conference Rooms

o    Vault

  • A new kitchen and serving area adjacent to the new Parish Hall.
  • Relocated fish fry broilers

Ask Steve the Builder!

The New
St. Francis of Assisi
Roman Catholic Church


Font for New Church


Construction from June 2009


Project Team



St. Francis project team members are Architectural Innovations and Fransen Pittman General Contractors, along with many dedicated subcontractors.

Fransen Pittman General Contractors is an Englewood-based company established in 1994 by Von Fransen and John Pittman. Employing 80 experienced and talented team members, the firm is engaged exclusively in commercial, institutional, medical and light industrial construction. Fransen Pittman’s work is primarily negotiated. The firm has built long-term relationships in the Front Range community by providing unparalleled pre-construction services and a consistent commitment to quality, value and customer satisfaction. In the last 14 years Fransen Pittman has been engaged on 70 church facility projects, each one unique and personally meaningful to the firm’s dedicated project teams.

Fransen Pittman’s team on the St. Francis of Assisi Roman Catholic Church project includes Josh Davis, Project Manager. Josh started his career with Fransen Pittman more than seven years ago and was a senior estimator in the pre-construction department before joining the project management team. A graduate of Colorado State University’s Construction Management program, Josh has more than a decade of experience in the construction industry. His most recent project was a new $10.8 million church facility in Aurora.

Steve Anderson, Project Superintendent, has more than 30 years of construction experience. He is one of four senior superintendents at Fransen Pittman and has been with the firm for 12 years. Steve is a member of Fransen Pittman’s Quality Control committee and uses his knowledge and experience to improve the firm’s quality procedures. A personable and capable leader, Steve is responsible for the day-to-day control and coordination of all field forces. His last project was the new $9.4 million Ronald McDonald House in Aurora.

Architectural Innovations (provided by Brett)

Other Project Partners

Lightening Ventures (link to www. lightningventures.com) – Earthwork Services

 Greiner Electric (link to www.greinerelectric.com) – Electrical Services

 Yenter Companies, Inc. (link to www.yenter.com) = Rock and Soil Stabilization Services

 

www.stfranciscr.org
saint francis of assisi roman catholic church
Web site templatesBusiness directory UKYellow pages USWebsite design companyWeb design directoryWeb design directory AustraliaWeb design directory CanadaFree church / religious web templates